Author: Ralph C. Hon
Publisher:
ISBN: UIUC:30112105933953
Category: Railroads
Page: 18
View: 762
Author: Ralph C. Hon
Publisher:
ISBN: UIUC:30112105933953
Category: Railroads
Page: 18
View: 762
Several problems exist in the current rail freight rate system . We must accumulate data on these problems , study them in detail and gradually adjust them so that rail rates can better fulfill their function of encouraging production ...
Author: China. Tie dao bu
Publisher:
ISBN: UOM:39015012068352
Category: Railroads
Page: 469
View: 323
Otherwise, extending the current chain continues with the next type. A chain also finishes whenever the first type of the next outbound train is reached. This procedure is formally described by Algorithm 1. It receives as its input the ...
Author: Jens H. Maue
Publisher: Cuvillier Verlag
ISBN: 9783736939387
Category: Computers
Page: 174
View: 878
Mr. Budd will speak on current railway problems as related to engineering . Aitchison Guest of Traffic Club for Anniversary Clyde B. Aitchison , Interstate Commerce Commissioner , was the guest at a luncheon of the Traffic Club of ...
Author:
Publisher:
ISBN: UOM:39015010880394
Category: Railroads
Page:
View: 522
Author: Samuel Orace Dunn
Publisher:
ISBN: UCAL:$B280839
Category: Railroads
Page: 85
View: 415
Let a certain sum - say , the present guaranteed net income - be made a preferential charge upon the railway system to satisfy the claims of the present holders of railway securities . Let extensions and improvements be financed by the ...
Author: Walton Hale Hamilton
Publisher:
ISBN: OSU:32435006097901
Category: Economics
Page: 955
View: 963
The three industries each analyzed its own particular challenges with regard to improving current rail service and its ability to obtain adequate expanded services to match future growth in production . This analysis crystallized around ...
Author:
Publisher:
ISBN: NWU:35556030196141
Category:
Page:
View: 586
The fundamental industry problems set forth in both the latest USRA and the RSPO reports must be addressed in any long term solution to the current rail problem . In my opinion , attaching the credit of the U. S. Treasury to any ...
Author: United States. Congress. House. Committee on Interstate and Foreign Commerce. Subcommittee on Transportation and Commerce
Publisher:
ISBN: LOC:00183873180
Category:
Page: 1114
View: 274
Several realistic instances of the problem have been verified as well as different traffic conditions and train configurations. The method can be applied to any railway line and does not require a specific configuration in the railway ...
Author: Roque Marín
Publisher: Springer
ISBN: 9783540459156
Category: Computers
Page: 482
View: 446
The fundamental industry problems set forth in both the latest USRA and the RSPO reports must be addressed in any long term solution to the current rail problem . In my opinion , attaching the credit of the U. S. Treasury to any ...
Author: United States. Congress. House. Committee on Interstate and Foreign Commerce
Publisher:
ISBN: STANFORD:36105021022301
Category:
Page: 1114
View: 562